We have professional QC team to inspect products and will operate several commissioning work to ensure good product condition before final delivering.
- Over-speed/under-speed,
- Emergency stop
- Low oil pressure;
- High water temperature
- Failure to start
- Overload
- Mains failure
- Synchronization failure
- Speed governing limit
- Phase missing
- Different load testing
1) idle
2) 10% load
3) 25% load
4) 50% load
5) 75% load
6) 100% load
7) 110% load
- Appearance check
- Spare parts and manuals and tools check
![]() |
|
![]() |
|
![]() |
|
![]() |
|